Hampshire Road & Essex Avenue Project
The Essex and Hampshire Area Drainage Repair Project will replace the current failing drainage system. The project is in the concept design stage which includes a public outreach meeting for property owners whose properties may be directly affected in some way. This public meeting will occur July 9, 2024 at 6 pm on the street in front of 8 Hampshire Road. Representatives from the City of Portsmouth and the project design firm CMA will be in attendance to give a brief project overview, walk the current drainage system as well as the proposed new system and address any questions or concerns property owners may have. A future public meeting will be held for all residents within the area once a design is finalized.